- Checklist for bundling and stacking a net
|
X
|
X
|
|
- Prepare report inventoring progress of each Special Project assigned to the vessel for the next leg’s deck lead
|
|
X
|
|
- Check survival suit inventory, to ensure all incoming scientific Personnel have a suitable size
|
|
|
X
|
- Collect all boots and rain gear loaned to interns and others as they depart the vessel
|
X
|
X
|
|
- Freshwater rinse all metal tools and parts (bolts, washers, nuts etc.) that have been on deck and exposed to saltwater
|
|
X
|
|
- For completed otolith trays:
|
|
X
|
|
- Scrub and pressure-wash deck tables, baskets, and white totes
|
|
X
|
|
- All tools cleaned and replaced in their proper case and location
|
X
|
X
|
|
- Clean and dry on-deck ID guides
|
|
X
|
|
- Ethanol and formalin buckets capped with uncut lids and buckets properly labeled
|
|
X
|
|
- Put frozen specimens in freezer boxes, properly labeled and seal with tape and ship
|
|
X
|
|
- Take properly sealed and labeled stomach buckets to Coastal Transportation for shipment
|
|
X
|
|
- Record the quantity of packages associated with each project and email or deliver that information to the Special Projects Coordinator
|
|
X
|
|
- Remaining ethanol and formalin properly stored and labeled
|
|
X
|
|
- Chemical storage cleaned and rinsed thoroughly and chemicals returned
|
|
X
|
|
- Stuff all used bedding and pillows in trash bags labeled USED
|
X
|
X
|
X
|
- Clean and vacuum state rooms and remove trash (each leg!)
|
X
|
X
|
X
|